Installing The Peltier Thermal Station - Agilent Technologies AssayMAP Bravo Installation Manual

Platform
Table of Contents

Advertisement

Installing the Peltier Thermal Station

Before you start
AssayMAP Bravo Platform Installation Guide
IMPORTANT
A protruding setscrew will prevent proper seating of the
labware in the platepad.
Figure Setscrew in platepad tab
Note: You will verify the deck configuration in the corresponding Bravo profile
and set the teachpoint for the deck location in a subsequent procedure.
To accommodate the height of the Peltier Thermal Station below the Bravo
deck, risers are required. The Peltier Thermal Station is too tall to sit at deck
level and must be installed in a deck cutout. The following figure shows the
assembled Peltier Thermal Station with the custom plate nest.
Figure Assembled Peltier Thermal Station with custom plate nest
CAUTION
Ensure that the connector end of the cable on the Peltier Thermal Station does
not knock against the metallic table top or other areas as it could get permanently damaged.
Handle the Peltier Thermal Station cable with care during all stages of installation.
Ensure you have the following:
Peltier Thermal Station assembly (including four M3 bolts, four M4 bolts,
and one M3 flathead cap screw)
Hex drivers for M6 and M3 screws
Inheco STC Controller, power and communication cables, and Inheco user
documentation for the STC Controller
Carefully handle the cable of the Peltier Thermal Station during removal from
the box, as the following figure shows.
Installing the platform

Installing the Peltier Thermal Station

21

Advertisement

Table of Contents
loading

Table of Contents