Agilent Technologies AssayMAP Bravo Installation Manual page 27

Platform
Table of Contents

Advertisement

Connecting the Pump Module
AssayMAP Bravo Platform Installation Guide
To connect the Pump Module:
1
At the Bravo rear connector panel, connect the Pump Module RJ- 45 cable
to the Pump I/O port (1), as the following figure shows. Connect the other
end of the cable to the COM IN port (2) on the rear of the Pump Module.
00220
Bravo
Back
2
Connect the Pump Module power cord between the AC connector on the
Pump Module and an AC outlet with a grounded circuit.
For detailed installation instructions, see the
Installing the 96AM Wash Station and Pump Module
1
Pump Module User
Installing the platform
2
100V-240V
50/60Hz
1.5 Amps
Guide.
19

Advertisement

Table of Contents
loading

Table of Contents