Agilent Technologies AssayMAP Bravo Installation Manual page 32

Platform
Table of Contents

Advertisement

Installing the platform
Installing the Peltier Thermal Station
24
b
Ensure that the safety label
c
Press and hold from the bottom to squeeze in the metal as you insert
the Peltier Thermal Station assembly into the hole.
d
Position the bracket over the top of the assembly, and ensure the
bracket is seated on the deck surface.
e
If there is slight resistance when fitting the assembly into the cutout or
when positioning the bracket, you may use a rubber mallet to tap the
metallic base or bracket into place.
CAUTION
Using too much force with a rubber mallet can damage the Peltier
Thermal Station.
Figure Tapping the Peltier Thermal Station bracket in place
f
Ensure that the Peltier Thermal Station sits flush in the cutout and
that the bracket is seated on the Bravo deck.
5
Use a hex driver to install the four M3 bolts that secure the bracket to the
deck.
Figure Securing the Peltier Thermal Station to the deck
faces the front of the Bravo deck.
AssayMAP Bravo Platform Installation Guide

Advertisement

Table of Contents
loading

Table of Contents