Installation Workflow For Standard Configuration - Agilent Technologies AssayMAP Bravo Installation Manual

Platform
Table of Contents

Advertisement

Installing the platform

Installation workflow for standard configuration

Installation workflow for standard configuration

Step
For this task...
1
Verify that the installation site meets the site
requirements.
IMPORTANT
bowed and is perfectly flat and rigid. A bowed or wobbly
table will cause placement errors during protocol
execution.
Clear the table of all other material that may interfere
with the installation.
2
Unpack and connect the computer.
3
Unpack the Bravo Platform and accessories.
IMPORTANT
from the head mount until after you have installed the
risers
("Installing the Bravo risers" on page
4
Install the Bravo deck risers.
5
Connect the Bravo Platform power cord, communications
cable, and pendant cable.
6
Install the Bravo 96AM Head.
7
Install the 96AM Wash Station and Pump Module.
8
Install the standard platepads at the specified Bravo
deck locations.
9
Install the Peltier Thermal Station and the Inheco STC
Controller.
10
Install the Orbital Shaking Station.
11
Set up the software, and configure the device files.
12
Set the AssayMAP head teachpoints in every one of the
AssayMAP profiles. Verify the gripper offset in every
profile.
13
Install the Bravo shields and Light Curtain.
14
Verify the installation and setup.
4
Ensure that the laboratory table is not
Do not remove the y- axis shipping stop
See...
Bravo Platform Safety and
Installation Guide
Manufacturer's instructions
Bravo Platform Unpacking
Guide
5).
"Installing the Bravo risers" on
page 5
Bravo Platform Safety and
Installation Guide
"About installing the AssayMAP
head" on page 8
"Installing the 96AM Wash
Station and Pump Module" on
page 10
"Installing the standard
platepads" on page 20
"Installing the Peltier Thermal
Station" on page 21
"Installing and connecting the
Orbital Shaking Station" on
page 26
"Setting up the computer and
software" on page 31
"Setting the teachpoints" on
page 57
Bravo Platform Safety and
Installation Guide
"Verifying the installation and
setup" on page 79
AssayMAP Bravo Platform Installation Guide

Advertisement

Table of Contents
loading

Table of Contents