Agilent Technologies AssayMAP Bravo Installation Manual page 26

Platform
Table of Contents

Advertisement

Installing the platform
Installing the 96AM Wash Station and Pump Module
00306
18
5
Connect the tubing from the Pump Module to the wash station tubing as
follows:
a
Cut two lengths of the 1/4- inch tubing, approximately 61- to 91.4- cm
(2- to 3- foot) long each.
b
Connect one of these tubing sections to the tubing assembly from the
bottom pump (outlet line).
c
Cut the remaining length of tubing (from step a) in the middle, and
install the inline pump filter onto the cut ends. Connect this tubing
assembly to the top pump (inlet line).
IMPORTANT
Ensure that the filter is oriented so that the three
thumbscrews face toward the Pump Module.
d
Connect the inlet and outlet lines from the Pump Module to the
corresponding lines on the wash station.
6
Connect the tubing from the Pump Module to the source and waste carboys
as follows:
a
Cut a length of the 1/4- inch tubing measured for the distance from the
source bottle to the Pump Module. Allow plenty of slack in the tubing.
b
Place the appropriate quick- disconnect fitting on each end on this
tubing. Connect one end of the tubing to the output port of the source
carboy and connect the other end to the tubing assembly in the top
pump (inlet line).
c
Cut a length of the 1/4- inch tubing measured for the distance from the
waste carboy to the Pump Module. Allow plenty of slack in the tubing.
d
Place the appropriate quick- disconnect fitting on each end on this
tubing. Connect one end of the tubing to the output port of the waste
carboy, and connect the other end to the tubing assembly in the bottom
pump (outlet line).
AssayMAP Bravo Platform Installation Guide

Advertisement

Table of Contents
loading

Table of Contents