Standard Installation Times - Agilent Technologies 5110 ICP-OES Service Manual

Hide thumbs Also See for 5110 ICP-OES:
Table of Contents

Advertisement

10
Installation Guide (5110 ICP-OES)

Standard installation times

Standard installation times

Standard installation times for the Agilent 5110 ICP- OES systems are:
• Instrument
• SPS 4
• VGA
• Ultrasonic nebulizer
This includes:
• Instrument installation
• Water cooler connection/commissioning
• Commissioning/ testing/handover
• Basic customer training safety information
You must read and understand the safety information presented in this section before you start
an installation or you may expose yourself or others to danger.
Avoid spilling water during installation and routine maintenance of the water cooling system.
WARNING
Spills over active electrical circuits could cause death or severe electrical shock. Check that
power sources are disconnected before working on the instrument, its accessories or
peripherals.
Installation by unauthorized personnel is not permitted and will immediately void the
WARNING
instrument warranty. Unskilled, improper or careless installation can create the risk of fire,
explosion, electric shock and various other hazards that can cause death or serious injury to
personnel. All users of these systems must be familiar with correct operating procedures and
safety practices as explained in this manual and in the Agilent 5110 ICP-OES Operation
manual.
Agilent 5110/5100 ICP-OES Service Manual
8.5 hours
1 hour
1 hour
2 hours
Agilent Restricted
267

Advertisement

Table of Contents
loading

This manual is also suitable for:

5100 icp-oes

Table of Contents