B
8-110
ASSEMBLY
Oil Filter Assembly
1. Install the oil filter and a new gasket.
Tightening torque:
19-25 N·m (1.9-2.6 m-kg,14-19 ft-Ib)
2. Instal.1 the oil pipe and a new O-ring.
Tightening torque:
19-25 N·m (1.9-2.6 m-kg, 14-19 ft-Ib)
Injection Pump Oil Pipe
1.
Install the injection pump oil pipe.
Tightening torque
@:
9.8-13 N-m (100-130 em-kg, 87-113 in-Ib)
@:
19-25 N·m (1.9-2.6 m-kg, 14-19 ft-Ib)
Fuel Pipe
1. Install the fuel pipe.
Tightening torque:
9.8-13 N·m (100-130 em-kg, 87-113 in-Ib)
PCV Chamber
1. Install the PCV chamber.
Tightening torque:
19-25 N-m (1.9-2.6 m-kg, 14-19 ft-Ib)