CHAPTER 6

Preparation Overview

Site Preparation Checklist for EX2200 Switches

Table 28: Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Copyright © 2016, Juniper Networks, Inc.
The checklist in
Table 28 on page 47
preparing a site for EX2200 switch installation.
For More Information
"Environmental Requirements and
Specifications for EX Series Switches"
on page 49
"Power Specifications for EX2200
Switches" on page 63
summarizes the tasks you need to perform when
Performed by
Date
47