Table 28: Site Preparation Checklist (continued)
Item or Task
Choose the number and types of switches you
want to install.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Wall
Verify that the wall meets the minimum
requirements for the installation of the switch.
Verify that there is appropriate clearance in your
selected location.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.
Related
Documentation
48
For More Information
"EX2200 Switches Hardware
Overview" on page 3
"Rack Requirements for EX2200
Switches" on page 56
"Cabinet Requirements for EX2200
Switches" on page 57
"Clearance Requirements for Airflow
and Hardware Maintenance for
EX2200 Switches" on page 58
"Requirements for Mounting an
EX2200 Switch on a Desktop or Wall"
on page 55
"Clearance Requirements for Airflow
and Hardware Maintenance for
EX2200 Switches" on page 58
General Safety Guidelines and Warnings on page 211
General Site Guidelines on page 53
Installing and Connecting an EX2200 Switch on page 117
Mounting an EX2200 Switch on page 118
Performed by
Date
Copyright © 2016, Juniper Networks, Inc.