3.2

Inspections upon Receipt

3.2.1

Inspection of Features and Ratings

Ordering Number
3.2.2

Electrical Check

Power-Up
o
o
o
o
7SA6 Manual
C53000-G1176-C133-1
Verify that the 7SA6 has the expected features by checking the complete ordering
number with the ordering number codes given in Sub-section A.1 of the Appendix.
Also check that the required and expected accessories are included with the device.
The ordering number of the device is on the nameplate sticker attached to the top of
the housing. The nameplate also indicates the current, voltage, and power supply
ratings of the device. A verification that these ratings are the expected values is
especially important. The jumpers for the control voltage of the binary inputs are set
at the factory for a DC control voltage equal to the DC voltage rating of the power
supply. The jumpers can be changed if a different control voltage is to be used.
Operating conditions that meet VDE 0100/5.73 and VDE 0105 Part 1/7.83, or national
and international standards, are to be observed.
Before applying power supply voltage or any measuring quantities for the first time, be
sure the device has been in the operating area for at least two hours. This time period
allows the device to attain temperature equilibrium, and prevents dampness and
condensation from occurring.
Warning!
The following inspection steps are done in the presence of dangerous voltages. Only
appropriately qualified personnel familiar with and adhering to safety requirements
and precautionary measures shall perform these steps.
For a first electrical inspection of the device it is sufficient to ensure safe grounding of
the housing and to apply the power supply voltage:
Connect the ground of the device solidly to the ground of the location. The ground of
a 7SA6 designed for flush mounting is on the rear panel; the ground of a device
designed for surface mounting is on the terminal with the grounding symbol.
With the protective switches (e.g. test switches, fuses, or miniature circuit breakers)
for the power supply open, prepare the connections to the power supply. Verify that
the power supply voltage has the correct magnitude. Check polarity connections to the
device inputs. Follow the appropriate connection diagram in the Appendix, Section
A.2.
Close the protective switches to apply the power supply.
The green "RUN" LED on the front panel must light after no more than 0.5 second, and
the red "ERROR" LED must go out after no more than 10 seconds.
Initial Inspections