Mazda 1990 323 Workshop Manual Supplement page 435

1990 mazda 323 4-wheel drive workshop manual supplement
Hide thumbs Also See for 1990 323:
Table of Contents

Advertisement

TRANSAXLE
AND TRANSFER
UNIT
K2
TRANSAXLE
AND TRANSFER UNIT (ASSEMBLY)
Preparation
SST
For
support
of
engine
49 GO17 501
Krt
of
49 GO17 5AO)
I
I
49 GO17 503
Hook
(Part of
49 GO17 5AO)
For
support
of
engine
49 GO17 502
Support
(Part of
49 GO17 5AO)
For
support
of
engine
I
,
03UOK2-255
Precaution
1. If the drive plates or brake band are replaced
with new ones, soak the new part in ATF for at least 2 hours
before installation.
2. Before assembly,
apply ATF to all seal rings, rotating
parts, O-rings,
and sliding
parts.
3. All O-rings,
seals, and gaskets
must be replaced
with the new ones included
in the overhaul
kit.
4. Use petroleum
jelly, not grease,
during
reassembly.
5. When it is necessary
to replace
a bushing,
replace the subassembly
that includes
that bushing.
6. Assemble
the housing
within 10 minutes
after applying
sealant,
and allow it to cure at least 30 minutes
after assembly
before filling the transaxle
with ATF.
03UOKX-442
K2-259

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents