TRANSAXLE
AND TRANSFER
UNIT
I
03UOJl - 126
03UOJ3-162
03UOJ3-163
03UOJ3-18
Tie-rod
end
1. Install the locknut.
Tightening
torque:
42-57
N.m (4.3-5.8
m-kg, 31-42
ft-lb)
2. Secure the locknut with a new cotter pin.
Propeller
shaft
1. Align the marks and install the propeller shaft.
(Refer to Section L.)
Control cable
1. Install the bracket.
Tightening
torque:
18-25
N#m (1.9-2.8
m-kg, 13-18
ft-lb)
2. Attach the control cable to the bracket with the clip.
3. Connect the control cable to the transaxle and transfer unit
and install the washers and the pins.
4. Connect the ground to the clutch pipe bracket.
Tightening
torque:
15-22
N-m (1.6-2.3
m-kg, 11-16
ft-lb)
Neutral switch connector
1. Install the bracket.
2. Connect the neutral switch connector.
J3-89