Cable Management Arm - IBM TotalStorage NAS Gateway 500 Service Manual

Hide thumbs Also See for TotalStorage NAS Gateway 500:
Table of Contents

Advertisement

Cable management arm

Cable management arm removal
1. Make sure that the system drawer is in the service position as described in "Placing the NAS Gateway
500 into the service position" on page 312.
2. Carefully unbundle the external cables by unfastening the Velcro fastener strips on the cable
management arm. Take extra care not to crimp or crease the cables.
3. Place the two captive snap buttons, located on the cable management arm, into the unlocked (pulled
out) position.
4. Unscrew the two M7 screws that secure the cable management arm to the rack-flange mounting
bracket.
5. Carefully remove the arm.
Cable management arm replacement
To replace the NAS Gateway 500 cable-management arm, do the following:
1. Attach the cable carrier support bracket to the back of the chassis with two screws.
2. Place the two captive snap buttons, located on the cable management arm, into the unlocked (pulled
out) position.
3. Align and insert the two captive snap buttons into the holes located on the cable carrier-support
bracket. Push in on the head of the snap buttons to lock them into position.
4
1 NAS Gateway 500
2 Cable carrier-support bracket
3 Captive snap button (2)
4. Open the cable-management arm so that the hinged mounting plate lies flat against the
flange-mounting bracket.
5. Align the holes, located on the cable-management arm mounting plate, with the threaded holes on the
rack-flange mounting bracket. Secure the bracket with two screws.
1
5
Chapter 11. Removal and replacement procedures
2
3
4 Rack-flange mounting bracket
5 Cable management arm
323

Advertisement

Table of Contents
loading

Table of Contents