IBM TotalStorage NAS Gateway 500 Service Manual page 194

Hide thumbs Also See for TotalStorage NAS Gateway 500:
Table of Contents

Advertisement

Table 16. Service processor error codes (continued)
Error code Description
4069 00B4 Processor/VPD problem detected
4069 00B7 Insufficient hardware resources were detected to
continue IPL of the system after processor
subsystem testing and initialization was
completed.
4069 00D1 Informational message
4069 0100 Memory extender 0 on processor card 1
4069 0101 Memory extender 2 on processor card 1
4069 0130 Memory extender 0 on processor card 2
4069 0131 Memory extender 2 on processor card 2
4069 0A03 Reboot message on VPD channel 3 processor
card 1. Reboot is necessary for run-time array
gard to take effect.
4069 0A04 Reboot message on VPD channel 4 processor
card 2. Reboot is necessary for run-time array
gard to take effect.
4069 0B00 Problem with internal RIO interface (I/O slot 0,
I/O port 0)
4069 0B01 Problem with internal RIO interface (I/O slot 0,
I/O port 1)
4069 0B02 Problem with internal RIO interface (I/O slot 0,
I/O port 2)
4069 0B03 Problem with internal RIO interface (I/O slot 0,
I/O port 3)
4069 0B40 Problem with controller chip on CEC backplane
174
NAS Gateway 500 Service Guide
Action or
possible failing FRU
1. Check for system firmware updates.
2. Processor card 2
Location code: U0.1-P1-C2
Go to "MAP 1540: Problem Isolation Procedures"
on page 69.
Informational message
Processor card,
Location code: U0.1-P1-C1
Processor card,
Location code: U0.1-P1-C1
Processor card,
Location code: U0.1-P1-C2
Processor card,
Location code: U0.1-P1-C2
Reboot the system in slow mode. Run
diagnostics, and then go to "MAP 0235: System
Array Self-Repair Problem Resolution" in the
RS/6000 Eserver pSeries Diagnostic
Information for Multiple Bus Systems.
Reboot the system in slow mode. Run
diagnostics, then go to "MAP 0235: System
Array Self-Repair Problem Resolution" in the
RS/6000 Eserver pSeries Diagnostic
Information for Multiple Bus Systems.
CEC backplane, U0.1-P1
CEC backplane, U0.1-P1
1. Check for system firmware updates.
2. Check the cabling between the CEC and the
I/O subsystems.
3. CEC backplane, U0.1-P1
4. Call service support.
1. Check for system firmware updates.
2. Check the cabling between the CEC and the
I/O subsystems.
3. CEC backplane, U0.1-P1
4. Call service support.
1. CEC backplane, U0.1-P1.
2. Call service support.

Advertisement

Table of Contents
loading

Table of Contents