Download Print this page

Subaru 2009 IMPREZA Service Manual page 413

Hide thumbs Also See for 2009 IMPREZA:

Advertisement

(3) Disconnect the connection and remove the
brush.
10) Remove the rectifier as follows.
(1) Remove the bolts which secure the rectifier.
(2) Remove the cover on B terminal.
(3) Remove the nuts of B terminal, then remove
the rectifier.
Generator
D: ASSEMBLY
Assemble in the reverse order of disassembly.
1) Pull-out of the brush
Before assembling, press the brush down into the
brush holder, then fix the brush in that position by
inserting a [1 mm (0.04 in) dia., 40 — 50 mm (1.6 —
2.0 in) long] wire through the hole as shown in the
figure.
CAUTION:
After re-assembling, remove the wire.
SC-00088
2) Install the ball bearings.
SC-00089
(1) Set the ball bearings in the front cover, then
securely install an appropriate tool (such as a
socket wrench of proper size) to the bearing
outer race.
(2) Using a press to press the ball bearings into
the specified location.
(3) Install the bearing retainer.
3) Using a press to install the bearings (rear side)
to the rotor shaft.
4) Heat the bearing box in rear cover [50 to 60°C
(122 to 140°F)], and then press the rear bearing
into rear cover.
SC-00090
CAUTION:
Do not apply grease to the rear bearings. If
there is any oil on the bearing box, remove it
completely.
5) After re-assembling, manually turn the pulley to
check that the rotor rotates smoothly.
SC-00091
SC(H4SO)-19
STARTING/CHARGING SYSTEMS
(A)
(A) Wire
SC-00092

Advertisement

loading