Download Print this page

Wastegate Control Solenoid Valve - Subaru 2009 IMPREZA Service Manual

Hide thumbs Also See for 2009 IMPREZA:

Advertisement

15.Wastegate Control Solenoid
Valve
A: REMOVAL
1) Disconnect the ground cable from battery.
2) Disconnect the connector from the wastegate
control solenoid valve (A).
3) Disconnect pressure hose (B) from the waste-
gate control solenoid valve.
4) Remove the wastegate control solenoid valve
from the bracket
(A)
B: INSTALLATION
Install in the reverse order of removal.
Tightening torque:
6.4 N·m (0.7 kgf-m, 4.7 ft-lb)

Wastegate Control Solenoid Valve

IN-00203
(B)
FU-01192
FU(H4DOTC)-47
FUEL INJECTION (FUEL SYSTEMS)
C: INSPECTION
1) Measure the resistance between the boost con-
trol solenoid valve terminals.
2 1
Terminal No.
1 and 2
2) Check that air does not come out of (B) when
blowing in (A).
3) Connect the terminal No. 1 to the battery positive
terminal and the terminal No. 2 to the battery neg-
ative terminal. When supplying air to (A), check that
air is discharged from (B).
2 1
EC-02426
Standard
28 2
(20°C (68°F))
(A)
(B)
FU-04069
(A)
(B)
FU-04070

Advertisement

loading