Download Print this page

Subaru 2009 IMPREZA Service Manual page 199

Hide thumbs Also See for 2009 IMPREZA:

Advertisement

5. Purge Control Solenoid Valve
A: REMOVAL
1) Disconnect the ground cable from battery.
2) Disconnect the connector and evaporation hos-
es of purge control solenoid valve, and then re-
move the purge control solenoid valve.
Purge Control Solenoid Valve
EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)
IN-00203
EC-02253
EC(H4SO)-9
B: INSTALLATION
Install in the reverse order of removal.
Tightening torque:
19 N·m (1.9 kgf-m, 14.0 ft-lb)
NOTE:
Connect the evaporation hose as shown in the fig-
ure.
(B)
(A)
(A) To fuel pipe (intake manifold)
(B) To fuel pipe (evaporation line)
EC-02253
EC-02254

Advertisement

loading