Ricoh B264 Service Manual page 42

Table of Contents

Advertisement

MAIN MACHINE INSTALLATION
[A]
12. Remove the development roller unit [A] ( x 2), and set it on the paper.
13. Pour the developer [B] into the development unit.
NOTE: The developer lot number is embossed on the end of the developer
package. Do not discard the package until you have recorded the lot
number. ( 1-16)
1) Pour approximately 1/3 of the developer evenly along the length of the
development unit.
2) Rotate the drive gear [C] to work the developer into the unit.
3) Repeat until all the developer is in the development unit.
4) Continue to turn the drive gear until the developer is even with the top of the
unit.
14. Reassemble the development unit.
NOTE: Make sure that the earth plate [D] is positioned correctly.
15. Re-install the development unit and PCU.
B264/B265
B135I106.WMF
[D]
B195I019.WMF
1-12
[B]
[C]
B135I513.WMF
SM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B265Aficio 3035Aficio 3045

Table of Contents