INSTALLATION FLOW CHART

1.2 INSTALLATION FLOW CHART
The following flow chart shows how to install the optional units more efficiently.
Does the user require the Paper Tray Unit, LCT, or Finisher?
Place Copier on the paper tray unit
Install the paper tray unit
Bridge Unit: Needed for the finishers and external output tray.
Paper Tray Unit: Needed for LCT and finishers.
Other requirements: See Overall Machine Information – Installation Option Table.
B264/B265
Unpack Copier
Yes
Install the copier
Install the bridge unit (if required)
If the customer requires the 1-bin tray:
Remove the scanner unit
Install the 1-bin tray
Replace the scanner unit
Install the remaining options in any order