Chapter 4
Deploying the C65/76M

Predeployment

This deployment option is used to deploy the Catalyst 6000 family switch or Cisco 7600 series Internet
Router into CEMF before it has been attached to the network. After an object has been predeployed,
CEMF keeps the object in a decommissioned state until the device corresponding to the object is added
to the network. After the switch is brought on-line, the predeployed object will be commissioned
automatically. The following objects can be predeployed:
The remaining C65/76M objects are automatically discovered when the Network Element object is
commissioned.
Network Element, Software, and Chassis Object Predeployment
To manually predeploy the Network Element, Software, and Chassis C65/76M objects, select the pop-up
menu item, Deployment > Deploy Manager, from the appropriate container. The following example
describes how to manually predeploy a Catalyst 6500 series switch. To manually predeploy other
devices, use the pop-up menu from the other manager containers.
Choose Deployment > Deploy Catalyst 6500 Manager from the pop-up menu. This pop-up menu item,
shown in
Catalyst 6500 Manager container.
Network Element, Software and Chassis
Supervisor Modules
Ethernet Modules
Switch Fabric Modules
FlexWAN Modules
Port Adapter
Content Switching Module
EtherChannel Modules
Figure
4-17, is available from the Site level in the Physical container and at the top level of the
Deployment and Commissioning Process