Cisco VS-C6509E-S720-10G User Manual page 58

User guide
Table of Contents

Advertisement

Chapter 4
Deploying the C65/76M
Deployment and Commissioning Process
Figure 4-4
Map Viewer with a Newly Discovered Catalyst 6500 Switch
After the Network Element and Software objects have been created by the Auto Discovery process, their
contents need to be determined. This determination is made by commissioning the Network Element
object. When the Network Element object is commissioned, it executes a subchassis discovery process
that communicates with the switch to automatically determine the contents of the switch.
However, before the Network Element object can be commissioned, additional parameters are required.
Specifically, the Telnet and Enable passwords and the SNMP communities are required. To specify the
passwords and SNMP communities, right-click on the Network Element object (192.168.12.105 in
Figure
4-4) and choose Open Network Element Dialog from the pop-up menu, which will launch a
window that resembles
Figure
4-5.
Cisco 6500/7600 Series Manager User Guide
4-8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents