Charge Time - Saluki STB6684 Operation Manual

Insulation resistance meter
Table of Contents

Advertisement

STB6684/A Operation Manual

4.1.5 CHARGE TIME

The charge time on STB6684/A can be set.
This function can ensure capactive components are charged rapidly and speed the test.
If CHARGE TIME is set, the input amplifier will be shorted by a 1Ωresistance.
When charge time, measure delay and trigger are set, charge will be displayed before test, that
is, the test step (STEP) will be displayed in the sequence of CHARGE, WAIT, TEST.
————————————————————————————————————
N
O
T
E
:
N
O
T
E
:
N
O
T
E
:
This function is available only in single measure mode.
————————————————————————————————————
Range:
0S – 1000S
0mS –1000mS, by a resolution of 10mS.
0S – 1000S, by a resolution of 1S.
Operational steps for the CHARGE TIME setting:
1)Move the cursor to CHARGE TIME, the following softkeys are displayed:
↑(+)
It increases the charge time.
By each press of this key, the time increases 10mS (when the unit is mS) or 1S
(when the unit is S).
↓(-)
It decreases the charge time.
By each press of this key, the time decreases 10mS (when the unit is mS) or 1S
(when the unit is S).
2)Softkeys or numerical keys can be used to set the charge time.
When the numerical keys are used to input the desired charge time, the following
softkeys are displayed.
■ msec
■ sec
Above softkeys are applied to select the time unit and to end inputting.
When [ENTER] is used to confirm inputting, the default unit is S.
Chapter 4 [SETUP]
◇ 29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stb6684a

Table of Contents