Start-Up - Saluki STB6684 Operation Manual

Insulation resistance meter
Table of Contents

Advertisement

STB6684/A Operation Manual

2.6 Start-up

Connect the instrument to a 3-wire power socket.
NOTE: The instrument must be operated at the voltage of 90 V to 130 V AC(60Hz) or 198
V to 260V AC(50HZ).
Line wire (L), neutral wire (N) and earth ground (E) of the power socket should
correspond to that of the instrument power plug.
Turn on the instrument by pressing the power switch on the bottom left corner of the front
panel. The boot screen will be displayed.
Figure 2-4 shows the boot screen of STB6684 includinging our trade mark,
instrument model (STB6684) and the software version (Ver 1.0.0).
If the password protection is enabled, you will be required to input your password. After
inputting your password, press [ENTER] to enter into the main menu page.
——————————————————————————————————————
Note: This series of products have enabled password protection and the default password
is 2684. You can reset the password by yourself. See the password function in the
<SYSTME SETUP> page for more details.
——————————————————————————————————————
Chapter 2 Introduction to Front and Rear Panels
◇ 10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stb6684a

Table of Contents