H Configuring End-To-End Management Control; Management Control Using The Esf Fdl - Paradyne 9161 User Manual

Zhone 9161 mux: user guide
Hide thumbs Also See for 9161:
Table of Contents

Advertisement

Management and Control
Configuring End-to-End Management Control

Management Control Using the ESF FDL

2-4
When managing the T1 access unit remotely, you can establish a management
link across the network in one of three ways. You can:
H
Use the Facility Data Link (FDL) for a point-to-point ESF T1 link.
H
Use an Embedded Data Link (EDL) associated with a Sync Data port.
H
Use a Direct Data Link (DDL).
You can configure the T1 access unit to use FDL as a management link if
available for a point-to-point, ESF T1 link, where FDL is end-to-end.
T1 Access
LAN
NMS
Physical Connection
FDL
As shown in the example, in-band management is accomplished through the FDL
between the two T1 access units. Management data for T1 Access Unit B goes to
T1 Access Unit A, which then routes it into the FDL between the units. This
example assumes that the NMS (or Host) that is attempting to access T1 Access
Unit B is attached (using SLIP or PPP) via the COM port on T1 Access Unit A.
Set the Management Link configuration option to FDL.
Menu selection sequence:
Main Menu
Configuration
Unit A
T1
Network
Network Interface
April 1999
T1 Access
Unit B
496-15183
9161-A2-GH30-40

Advertisement

Table of Contents
loading

This manual is also suitable for:

9261

Table of Contents