H Test Timeout; H Starting And Stopping A Test - Paradyne 9161 User Manual

Zhone 9161 mux: user guide
Hide thumbs Also See for 9161:
Table of Contents

Advertisement

Test Timeout
Starting and Stopping a Test
"
9161-A2-GH30-40
A Test Timeout feature is available to automatically terminate a test (as opposed
to manually terminating a test) after it has been running a specified period of
time.
To use this feature, enable the Test Timeout configuration option under the
System Options branch of the menu tree, and set a duration for the test to run in
the Test Duration (min) configuration option (see Table 5-9,
Chapter 5, Setting Up ).
Use this procedure to start and/or abort specific tests. To abort all active tests on
all interfaces, see
Aborting All Tests
When the status of a test is . . .
Inactive
Active
You start or stop an individual test using the same general procedure. For more
specific instructions, see the individual test descriptions in this chapter.
Procedure
To start or stop a test:
1. Follow this menu selection sequence:
Main Menu
Test
2. Select a test screen for an interface and press Enter. The selected test
screen appears, with the cursor positioned in the Command column of the
first line (available test).
Start or Stop appears in the Command column, and Active or
Inactive appears in the Status column, based upon the test's current
status for that interface.
3. Select the test you want to start or stop and press Enter. The selected test for
the interface changes from Stop to Start, or from Start to Stop, also changing
the status of the test.
4. Press Enter again to start or stop the test.
on page 9-44.
The only command available is . . .
Start
Stop
April 1999
Troubleshooting
System Options
in
9-43

Advertisement

Table of Contents
loading

This manual is also suitable for:

9261

Table of Contents