Replacing Dc Power Supply (P/S-A2) - HindlePower Atevo Series Operating/Service Instructions Manual

Microprocessor-controlled float battery charger three phase input 16-1000 adc output
Hide thumbs Also See for Atevo Series:
Table of Contents

Advertisement

HindlePower Inc
14.3.12.
14.3.12. Replacing DC Power Supply (P/
S-A2)
S-A2)
Steps:
• Shut down and lock out all power to ATevo.
• Remove safety shield.
• The 9V DC Power Supply Board (P/S-A2) is plugged onto the bottom-center of Power Board
(A2), directly below the L2-2 lug.
• Gently pull the DC Power Supply Board off of the Power Board.
• Align the two (2) header sockets (on bottom of the replacement DC Power Supply Board)
with the J101 and J102 header pin strips on the existing Power Board.
• Gently press the new DC Power Supply Board (P/S-A2) onto Power Board (A2) until it
mates.
• Replace safety shield, and close the front panel door.
• Restart ATevo.
Copyright HindlePower Inc. 2021
Replacing DC Power Supply (P/
ATevo O&SI - 3PH Input (16-1000 Adc) - 1.1_en
Last modified: 12 September 2023
Page 283 of 311

Advertisement

Table of Contents
loading

This manual is also suitable for:

Atevo o&si-3ph

Table of Contents