HindlePower Inc
4.1.3.
4.1.3. Checking Installation
Checking Installation
Prior to powering up ATevo for the first time, it is recommended that:
• You have followed installation instructions carefully.
• You check that ac input supply voltage and battery voltage match information on ATevo
nameplate.
• Open the front panel
• Check battery polarity at DC Output Circuit Breaker (CB2+/-).
Copyright HindlePower Inc. 2021
ATevo O&SI - 3PH Input (16-1000 Adc) - 1.1_en
Last modified: 8 September 2023
Page 79 of 311