Install Border Covers Of The Power Cabinet; Install Border Covers Of Metal Frame Foundation - ABB HVC Installation Manual

450 kw e-bus charger
Table of Contents

Advertisement

HVC 450 kW E-Bus Charger Installation Guide

5.5.6. Install border covers of the Power Cabinet

Preconditions:
Tools: spanner (size 8 and 10).
M6 nuts and washers (4x) that were removed from the Power Cabinet (bag with
parts).
M5 bolts (4x) that were removed from the Power Cabinet (bag with parts).
1.
Put the front cover (A) against the bottom front of the Power Cabinet by aligning the four
bolts at the back side of the front cover (A) with the holes in the bottom front.
2.
Insert the M6 nut and washer (C) onto the bolts of the front cover (A) (4x).
3.
Tighten the nuts.
4.
Put the rear cover (B) against the rear front of the Power Cabinet.
5.
Insert the M5 bolts (D) into the holes (4x).
6.
Tighten the bolts.

5.5.7. Install border covers of metal frame foundation

Only applicable when the Power Cabinet is placed on a metal frame
foundation. The supplied front and rear cover on the Power Cabinet are
not used in this case.
Preconditions:
Tools: spanner (size 8)
Revision: 1.2
Date released: 16-08-2018
NOTICE
COMPANY CONFIDENTIAL
Page 62 of 128

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents