Download Print this page

NetApp ASA C Series Install page 313

Advertisement

fiber optic cables.
4. If the power supplies were unplugged, plug them back in and reinstall the power cable retainers.
5. Complete the reinstallation of the controller module:
a. Firmly push the controller module into the chassis until it meets the midplane and is fully seated.
The locking latches rise when the controller module is fully seated.
Do not use excessive force when sliding the controller module into the chassis to
avoid damaging the connectors.
The controller module begins to boot as soon as it is fully seated in the chassis.
b. Rotate the locking latches upward, tilting them so that they clear the locking pins, and then lower
them into the locked position.
c. If you have not already done so, reinstall the cable management device.
d. Halt the controller at the LOADER prompt.
6. Reset the time and date on the controller:
a. Check the date and time on the healthy controller with the
b. At the LOADER prompt on the target controller, check the time and date.
c. If necessary, modify the date with the
d. If necessary, set the time, in GMT, using the
e. Confirm the date and time on the target controller.
7. At the LOADER prompt, enter
controller reboot.
8. Return the controller to normal operation by giving back its storage:
-ofnode impaired_node_name
9. If automatic giveback was disabled, reenable it:
-auto-giveback true
== Step 7: Return the failed part to NetApp
Return the failed part to NetApp, as described in the RMA instructions shipped with the kit. See the
Return & Replacements
set date mm/dd/yyyy
to reinitialize the PCIe cards and other components and let the
bye
page for further information.
show date
command.
set time hh:mm:ss
storage failover giveback
storage failover modify -node local
command.
command.
Part
311

Advertisement

loading
Need help?

Need help?

Do you have a question about the ASA C Series and is the answer not in the manual?