Download Print this page

NetApp ASA C Series Install page 213

Advertisement

Connector
Part number and length
type
100 GbE cable X66211A-05 (112-00595), 0.5m
X66211A-05 (112-00595), 0.5m;
X66211-1 (112-00573), 1m
X66211-2 (112-00574), 2m;
X66211-5 (112-00576), 5m
10 GbE cable
X6566B-3-R6 (112-00300), 3m;
X6566B-5-R6 (112-00301), 5m
25 GbE cable
X66240A-2 (112-00598), 2m;
X66240A-5 (112-00600), 5m
RJ-45 (order
Not applicable
dependent)
Fibre Channel
X66250-2 (112-00342) 2m;
X66250-5 (112-00344) 5m;
X66250-15 (112-00346) 15m;
X66250-30 (112-00347) 30m
Micro-USB
Not applicable
console cable
Power cables
Not applicable
4. Download and complete the
== Step 2: Install the hardware
You need to install your system in a 4-post rack or NetApp system cabinet, as applicable.
Steps
1. Install the rail kits, as needed.
Installing SuperRail into a four-post rack
2. Install and secure your system using the instructions included with the rail kit.
Type of
cable...
Cluster Configuration
Worksheet.
For...
HA interconnect
Cluster interconnect network
Storage, Data
Data
Data
Management
Console connection during
software setup
Powering up the system
211

Advertisement

loading
Need help?

Need help?

Do you have a question about the ASA C Series and is the answer not in the manual?