Download Print this page

NetApp ASA C Series Install page 160

Advertisement

This task only applies to two-node MetroCluster configurations.
Steps
1. Verify that all nodes are in the
cluster_B::>
DR
Group Cluster Node
----- ------- -------------- -------------- ---------
--------------------
1
cluster_A
 
completed
 
cluster_B
 
switchback recovery
2 entries were displayed.
2. Verify that resynchronization is complete on all SVMs:
3. Verify that any automatic LIF migrations being performed by the healing operations were completed
successfully:
metrocluster check lif show
4. Perform the switchback by using the
surviving cluster.
5. Verify that the switchback operation has completed:
The switchback operation is still running when a cluster is in the
cluster_B::> metrocluster show
Cluster
--------------------
 Local: cluster_B configured
Remote: cluster_A configured
The switchback operation is complete when the clusters are in the
cluster_B::> metrocluster show
Cluster
--------------------
 Local: cluster_B configured
Remote: cluster_A configured
If a switchback is taking a long time to finish, you can check on the status of in-progress baselines by
158
state:
enabled
metrocluster node show
Configuration
State
controller_A_1 configured
controller_B_1 configured
metrocluster switchback
Configuration State
-------------------
Configuration State
-------------------
metrocluster node show
DR
Mirroring Mode
enabled
enabled
metrocluster vserver show
command from any node in the
metrocluster show
waiting-for-switchback
Mode
switchover
waiting-for-switchback
normal
Mode
normal
normal
heal roots
waiting for
---------
state.:
---------
state:

Advertisement

loading
Need help?

Need help?

Do you have a question about the ASA C Series and is the answer not in the manual?