IBM eserver p Series Service Manual page 661

Hide thumbs Also See for eserver p Series:
Table of Contents

Advertisement

CUoD Capacity Card
The capacity card can be removed and replaced using the following procedures:
Removal
1. Turn off power as described in "Powering Off and Powering On the System" on page 545.
2. Perform the operator panel removal procedure; see "Operator Panel" on page 639.
3. Remove the CUoD capacity card by pulling it straight up and out of the operator panel.
1 Operator Panel Cover
Replacement
1. With the operator panel cover removed, install the new CUoD capacity card into position J5 of the
connector card in the operator panel.
1 Operator Panel Cover
2. Perform the steps in the operator panel replacement procedure to reinstall the operator panel; see
"Operator Panel" on page 639.
3. Turn on the power as described in "Powering Off and Powering On the System" on page 545.
4. Contact service support to obtain the correct processor activation codes for the customer.
v If the customer is entitled to any processor activations, proceed to step 6 on page 642
v If the customer is not entitled to any processor activations, service support provides an activation
code of zero, complete step 5.
5. After you complete this step, the procedure is complete for this customer.
a. Right-click on the name of the managed system in the Contents area of the HMC System Manager
window. The name of the system displays as the system's serial number.
b. From the menu that displays, select the following options, in the following order:
1) Capacity Upgrade on Demand
2) Processor
3) Processor Activate
2
1
2
1
Chapter 9. Removal and Replacement Procedures
2 CUoD Capacity Card
2 CUoD Capacity Card
641

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eserver p650

Table of Contents