Tools And Material - Allied Telesis GS950 PS V2 Series Installation Manual

Gigabit ethernet poe+ switches
Hide thumbs Also See for GS950 PS V2 Series:
Table of Contents

Advertisement

Tools and Material

Here are the required tools and material for installing the switch on a
wooden wall with the standard brackets that come with the device:
Two standard brackets
Eight screws to secure the brackets to the switch (included with the
switch)
Four wood or concrete wall screws (included with the switch)
Four concrete wall anchors (included with the switch)
Cross-head screwdriver (not provided)
Stud finder for a wooden wall, capable of identifying the middle of
wall studs and hot electrical wiring (not provided)
Drill and 1/4" carbide drill bit for a concrete wall (not provided)
Plywood base if you are installing the switch on a wall with wooden
studs (not provided.) Refer to "Plywood Base for a Wall with
Wooden Studs" on page 61 for illustrations.
Four screws and anchors for attaching the plywood base to the
wall (not provided)
Caution
The supplied screws and anchors may not be appropriate for all wall
material. A qualified building contractor should determine the
appropriate hardware requirements for your wall before installing the
switch.  E88
GS950 PS V2 Series of Gigabit Ethernet PoE+ Switches Installation Guide
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs950/10ps v2Gs950/18ps v2Gs950/28ps v2Gs950/52ps v2

Table of Contents