Tools And Material - Allied Telesis AlliedWare Plus x530DP Series Installation Manual

Stackable gigabit layer 3 ethernet switches
Hide thumbs Also See for AlliedWare Plus x530DP Series:
Table of Contents

Advertisement

Chapter 6: Installing the Switch on a Wall
Tools and
Material
82
The following tools and material are required for installing the switch on
a wall.
Included with switch:
Four wall/equipment rack brackets for the x530DP-28GHXm
switch.
Sixteen screws for attaching the wall/equipment rack brackets to
the switch: Length: 6.0mm (0.2 in.) Diameter: 4.0mm (0.2 in.).
Four anchors for concrete walls for the switch: Length: 29.6mm
(1.2 in.) Diameter: 6.0mm (0.2 in.).
Four screws for wood or concrete walls for the switch:
Length: 32mm (1.3 in.) Diameter: 4mm (0.2 in.).
Two power cord retaining clips.
Not included with switch:
Cross-head screwdriver.
Stud finder for a wooden wall, capable of identifying the middle of
wall studs and hot electrical wiring.
Drill and 1/4-inch carbide drill bit (for a concrete wall).
Refer to "Installing the Switch on a Concrete Wall" on page 87.
Plywood base (if you are installing the switch on a wall with
wooden studs). Refer to "Plywood Base for a Wall with Wooden
Studs" on page 83 for illustrations.
Four screws for attaching the plywood base to the wall.
Caution
The supplied screws and anchors might not be appropriate for all
walls. A qualified building contractor can determine the hardware
requirements for your wall prior to installing the switch.  E88

Advertisement

Table of Contents
loading

Table of Contents