Tools And Material - Allied Telesis x330-10GTX Installation Manual

Gigabit layer 3 ethernet switch
Hide thumbs Also See for x330-10GTX:
Table of Contents

Advertisement

Tools and Material

Here are the required tools and material for installing the switch on a
wooden or concrete wall with the BRKT-J23 brackets:
One or two BRKT-J23 bracket kits
Four or eight wall screws (not provided)
Cross-head screwdriver (not provided)
Stud finder for a wooden wall, capable of identifying the middle of
wall studs and hot electrical wiring (not provided)
Depending on the wall material these items might also be required:
Drill for pre-drilling the holes (not provided)
Four or eight wall anchors (not provided)
Caution
The supplied screws and anchors may not be appropriate for all wall
material. A qualified building contractor should determine the
appropriate hardware requirements for your wall before installing the
switch.  E88
x330-10GTX Gigabit Ethernet Switch Installation Guide
63

Advertisement

Table of Contents
loading

Table of Contents