Installation Tools And Material - Allied Telesis SwitchBladex8112 Installation Manual

Table of Contents

Advertisement

Chapter 4: Safety Precautions and Site Requirements

Installation Tools and Material

96
Here are the installation tools and material you need to have to install the
product.
Installing the chassis in an equipment rack requires the following items:
#2 Phillips-head screwdriver
Six equipment rack screws
Flat-head screwdriver
#2 Phillips-head 10 inch-lbs torque screwdriver (optional)
The grounding wire requires the following items:
#2 Phillips-head screwdriver
Crimping tool
10 AWG stranded grounding wire
#2 Phillips-head 20 inch-lbs torque screwdriver (optional)
The AT-SBxPWRSYS1 DC Power Supply requires the following items:
Two 8 AWG power wires
One 10 AWG stranded grounding wire
8 mm wrench
#1 Phillips-head screwdriver
#3 Phillips-head screwdriver
#3 Phillips-head 30 to 40 inch-lbs torque screwdriver (optional)
The AT-SBx81CFC960 Controller Fabric Card and Ethernet line cards
require the following items:
#2 Phillips-head screwdriver
#2 Phillips-head, 5 inch-lbs torque screwdriver (optional)
Section II: Installing the Chassis

Advertisement

Table of Contents
loading

Table of Contents