Chapter 3: Installing the Chassis
76
4. With a #2 Phillips-head screwdriver, loosen the handle locking screw
on the power supply, as shown in Figure 38.
Figure 38. Loosening the Handle locking Screw on the SBxPWRSYS1-80
5. Lift the handle on the SBxPWRSYS1-80 DC Power Supply. Refer to
Figure 39.
Figure 39. Lifting the Locking Handle on the SBxPWRSYS1-80 DC Power
6. Carefully align the power supply in the slot and slide it into the slot until
it makes contact with the connector inside the chassis. Refer to Figure
40 on page 77.
DC Power Supply
Supply