Mount The Base Station Or Repeater On The Wall - Cisco 6800 Series Administration Manual

Hide thumbs Also See for 6800 Series:
Table of Contents

Advertisement

Hardware Installation
Step 2
Provide power to the device:
• Base station with PoE on the LAN: Additional power is not required.
• Base station without PoE: Plug the power adapter into the base station and route the cable through the
• Repeater: Plug the power adapter into the repeater and route the cable through the slot in the repeater.
Step 3
Slide the stand into the device and press it until it clicks into place.
This graphic shows the stand connection to the base station. The back of the repeater is similar to the base
station.
Step 4
Base station only: Plug the Ethernet cable into the LAN port.
Step 5
If required, plug the power adapter into the electrical outlet.
What to do next
Do one of these:
• Base station installation:
• Repeater installation:

Mount the Base Station or Repeater on the Wall

You can mount the base station or repeater on a wall. You put two screws into the wall and slip the base
station or repeater onto the screw heads or you can use the ceiling mount bracket.
slot in the base station.
• Manual configuration:
Station, on page 46
• Automatic configuration:
Registration, on page 51
Add a Repeater, on page 52
Sign in to the Administration Web Page, on page 42
Sign in to the Administration Web Page, on page 42
Cisco IP DECT 6800 Series Administration Guide

Mount the Base Station or Repeater on the Wall

and
Configure the Base
and
Start Handset
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

68236825

Table of Contents