Cisco 6800 Series Administration Manual page 42

Hide thumbs Also See for 6800 Series:
Table of Contents

Advertisement

Mount the Base Station or Repeater on the Wall
Step 7
Put the device on the wall.
• Without the ceiling mount bracket: This diagram shows the alignment of the screw heads and the device.
This diagram shows how you seat the device on the screw heads.
• With the ceiling mount bracket: Hold the device with the lettering in the Cisco logo on the bottom and
turn slightly right. Align the slots on the underside of the device with the hooks on the bracket, press the
device into the bracket, and turn it left until the device is attached.
Step 8
Base station only: Plug the Ethernet cable into the LAN port.
Step 9
If required, plug the power adapter into the electrical outlet.
What to do next
Do one of these:
• Base station installation:
• Manual configuration:
Cisco IP DECT 6800 Series Administration Guide
34
Sign in to the Administration Web Page, on page 42
Station, on page 46
Hardware Installation
and
Configure the Base

Advertisement

Table of Contents
loading

This manual is also suitable for:

68236825

Table of Contents