Installation And Commissioning; Overview - ABB Robotics FlexGripper Product Manual

Claw
Table of Contents

Advertisement

2.3 Installation and Commissioning

2.3.1 Overview

Overview
This instruction is primarily intended for use when unpacking and installing the
gripper for the first time. It also contains information useful during later installation
of the FlexGripper.
The new gripper was packed by the standard of sea transportation, land
transportation and air transportation on delivery.
Product Manual - FlexGripper-Claw
4GAA40401009901-001 Revision: A
Note
Lifting should be done by four people or by a crane.
Do not hold the solenoid valves, terminal box or connectors when lifting the
gripper.
The gripper should be installed in an environment without electromagnetic
disturbance to ensure the performance of the magnetic proximity switches.
© Copyright 20132019 ABB. All rights reserved.
2 FlexGripper-Claw
2.3.1 Overview
35

Advertisement

Table of Contents
loading

Table of Contents