D Link Led Is Flashing - Mitsubishi Electric MELSEC Q Series Reference Manual

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

10.1.5

D LINK LED is flashing

The following flowchart shows the procedures to be taken when D LINK LED is flashing.
D LINK LED is flashing.
Is the power supply module ON
for the CC-Link IE controller network module with
external power supply function?
Start the PLC diagnostics in the programming tool.
Has a LINK PARA.ERROR or
NETWORK PARAMETER ERROR
occurred in the CPU module?
Has a stop error other than the
above occurred in the CPU module?
Has a link stop been executed?
Has a circuit test been executed?
Check error factors with the CC IE Control
diagnostics and take corrective actions according
to the troubleshooting section.
Page 541, Section 10.4
Is D LINK LED turned ON?
OFF
ON
Yes
No
Occurred
Not occurred
Executed
Not executed
Executed
Not executed
No
Yes
End
CHAPTER 10 TROUBLESHOOTING
Turn ON the power supply module.
Check the network parameters.
If the error has occurred in a Basic model QCPU
or safety CPU, check its LB/LW send range in
"Network range assignment" of the control station.
Page 183, Section 6.3
Check the error details and take corrective actions.
QCPU User's Manual
(Hardware Design, Maintenance and Inspection)
Restart cyclic transmission.
Page 91, Section 4.1.12
After completion of the test, set the control station
to online.
Page 165, Section 5.6.1
Perform a unit test to the CC-Link IE controller
network module.
Page 150, Section 5.4
10
501

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents