Changing The Number Of Transient Transmissions - Mitsubishi Electric MELSEC Q Series Reference Manual

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

4.2.5

Changing the number of transient transmissions

The number of transient transmissions that one station can execute during one link scan can be changed. (
201, Section 6.3.6)
● When a large number is set, if multiple transient requests are made in one link scan, the link scan time will be increased
temporarily. Therefore, do not set a number larger than necessary.
● When the fixed link scan time is desired, use the feature of the cyclic transmission punctuality assurance. (
80, Section 4.1.6)
CHAPTER 4 FUNCTIONS
Page
Page
105
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents