Mitsubishi Electric MELSEC Q Series Reference Manual page 448

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

(2) Function
(a) RRUN instruction overview
According to the Mode (n4) specification, the RRUN instruction execute remote RUN to the target station CPU.
The target station is specified in Target station network No. (Jn) and Target station No. (n2).
Upon completion of the request to the target station, the completion device (D1) turns ON.
[Own station]
CPU module
n4
(b) Target stations available for specification
• Target network
In addition to CC-Link IE Controller Network, stations in the following networks can be also specified.
• CC-Link IE Field Network
• MELSECNET/H
• MELSECNET/10
• Ethernet
• Target station's CPU type
The RRUN instruction is executable only when the target station is QCPU, RCPU, or LCPU.
(c) Checking the execution status of the RRUN instruction
The execution status of the RRUN instruction (Normal completion, Error completion) can be checked with the
following devices specified in the setting data.
• Completion device (D1)
Turns ON in the END processing for the scan after completion of the RRUN instruction, and goes OFF in
the next END processing.
• Completion status indication device ((D1)+1)
Turns ON in the END processing for the scan after completion of the RRUN instruction, and turns OFF in
the next END processing, only when the RRUN instruction has failed.
446
CC-Link IE Controller
Network module
Channel 1
RRUN
Channel n
Channel 8
[Target station]
CPU module
RUN
Network module

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents