Mitsubishi Electric MELSEC Q Series Reference Manual page 123

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

3.
Set the routing parameters in the CPU module 2.
Project window
4.
The normal station (station number 2) does not require an IP address.
The network address set in the control station (station number 1) is automatically assigned.
5.
Write the set parameters to the CPU module 2. Then reset the CPU module 2 or power off and on
the system.
[Online]
(3) Checking the status of communications
After the setting is completed in each module, execute the IP communication test to check for an error in the
communication route. (
• When the IP communication test is normally completed
The following window appears.
• When the IP communication test ends abnormally
If the test ends abnormally, click the
If IP communications cannot be performed due to a timeout error or other reasons, refer to "IP
communications cannot be performed using the IP packet transfer function." in this manual and take
corrective actions. (
[Parameter]
[Network Parameter]
button
[Write to PLC]
RESET
or Power OFF
Page 113, Section 4.3.3)
button in "Error Information" to check the error information.
Page 505, Section 10.1.8)
CHAPTER 4 FUNCTIONS
[Ethernet/CC IE/MELSECNET]
ON
4
121

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents