Mitsubishi Electric MELSEC Q Series Reference Manual page 35

Cc-link ie controller network
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

(8) Project data common to normal stations
For Universal model QCPUs, the station No. of a normal station (own station) can be set in the sequence
*1
program.
If there are any normal stations that can share the same sequence program and network parameters (except for
station No.), specifying their station numbers in the sequence program creates common project data for them,
allowing easy data management. (
*1
For modules other than Universal model QCPUs, station No. cannot be set in sequence programs.
Station Nos. must be set with network parameters.
Programming tool
For control
station
For normal
stations
For control
station
For normal
stations
Station No. setting by
sequence program
Page 136, Section 4.6)
Common project data can be created for
normal stations, resulting in easy management.
Station No. setting by
sequence program
For normal
stations
Control
Normal
station
station
(No.1)
(No.2)
Normal
Normal
station
station
(No.6)
(No.5)
For normal
stations
Station No. setting by
sequence program
CHAPTER 1 OVERVIEW
Station No. setting by
sequence program
For normal
stations
Normal
station
(No.3)
Normal
station
(No.4)
For normal
stations
Station No. setting by
sequence program
1
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qj71gp21-sxMelsec qj71gp21s-sx

Table of Contents