Figure 49: Sliding The At-Pwr600 Ac Power Supply Into The Switch - Allied Telesis AlliedWare Plus x950 Series Installation Manual

Advanced layer 3+, ethernet line card, ac power supply, fan module
Table of Contents

Advertisement

Chapter 4: Installing Power Supplies and Optional XEM2 Line Card
3. Carefully align the power supply in the slot and slide it into the slot.
Figure 49 shows the module aligned for the PSU A slot.
Figure 49. Sliding the AT-PWR600 AC Power Supply into the Switch
98

Advertisement

Table of Contents
loading

Table of Contents