Figure 31: Inserting The Voltage And Return Wires; Figure 32: Sliding The Dc Connector Into The Switch - Allied Telesis AT-IE510-28GSX Installation Manual

Industrial ethernet switch
Table of Contents

Advertisement

AT-IE510-28GSX Installation Guide
Figure 31. Inserting the Voltage and Return Wires
6. Slide the DC connector into the slot on the switch. Refer to Figure 32.
Figure 32. Sliding the DC Connector into the Switch
7. Tighten the two captive screws on the sides of the DC connector to
secure the connector to the switch. Refer to Figure 33.
69

Advertisement

Table of Contents
loading

Table of Contents