Figure 42: Sliding The At-Sbxpwrsys2 Ac Power Supply Into The Chassis; Figure 43: Lowering The Locking Handle On The At-Sbxpwrsys2 Ac Power Supply - Allied Telesis AT-SB*908 GEN2 Installation Manual

Advanced layer 3 plus modular switch, alliedware plus v5.4.8-0, virtual chassis stacking, chassis, ethernet line card, fan module, ac/dc power supply
Table of Contents

Advertisement

AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
Figure 42. Sliding the AT-SBxPWRSYS2 AC Power Supply into the
Chassis
5. Gently press on the faceplate of the power supply to seat the unit on
the connector on the backplane of the chassis, and lower the locking
handle to secure the unit in the chassis. Refer to Figure 43.
Figure 43. Lowering the Locking Handle on the AT-SBxPWRSYS2 AC
Power Supply
89

Advertisement

Table of Contents
loading

Table of Contents