Figure 35: Sliding The Sbxpwrsys2 Ac Power Supply Into The Chassis; Figure 36: Lowering The Locking Handle On The Sbxpwrsys2 Ac Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Stand-alone switches
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

SBx908 GEN2 Installation Guide for Stand-alone Switches
Figure 35. Sliding the SBxPWRSYS2 AC Power Supply into the Chassis
5. Gently press on the faceplate of the power supply to seat the unit on
the connector on the backplane of the chassis, and lower the locking
handle to secure the unit in the chassis. Refer to Figure 36.
Figure 36. Lowering the Locking Handle on the SBxPWRSYS2 AC Power
Supply
73

Advertisement

Table of Contents
loading

Table of Contents