Installation
3-4
Installation Requirements
Melter Clearances
Figure 3-1
Installation clearances around the melter
Part 1128350_02
Before installing the melter, ensure that the desired installation location
provides the required clearances, environmental conditions, and utilities.
Figures 3-1 and 3-2 show the recommended clearances around the melter.
Using the figures will ensure setting of the minimum clearances that are
required between the melter and:
-
Hoses
-
Cordsets
-
Power cabling
-
Tank lid
-
E-Box door
-
Air supply
-
Pump
NOTE: For melter dimensions and drawings, refer to Technical Data
(Section 7).
E 2020 Nordson Corporation